Power Infrastructure

Telehouse Canada is located in the epicenter of the internet exchange community. This location provides cost effective and readily accessible access to Toronto’s internet exchange carriers. To ensure constant connectivity and meet power demands, Telehouse Canada has implemented the following:

• 100% generator backup
• Size of fuel tank 1,000 to 10,000 gallons
• Generator both auto start and auto transfer. Isolation bypass feature on automatic transfer switch
• Minimum 24-hour run time fuel capacity / Two-hour response for fuel delivery
• UPS backup power

Other customer requests can also be accommodated. All our facilities support the following:

• Up to 16 KW’s per cabinet
• 120/208V AC and -48V DC available
• Voltage output 600 VAC transformed to 120/208 V
• -48 Volt DC Battery Plant
• True" A/B power feeds